SmugMug
Home | Login | Help |
|
Style:
&
|View Cart
Central Presbyterian  > Our place - buildings, construction, new plans > New Building - Construction
The Construction is all done! Dedication services April 20th!
Gallery pages:  <<  <  3  4  5  6  7  8  >  >>
< 49 of 477 >
Central Presbyterian > 1/18/2007: The concrete footers have been poured in the courtyard.
Central Presbyterian > 1/18/2007: The concrete footers have been poured in the courtyard. Here they are under covers.
Central Presbyterian > 1/18/2007: As you can see, the worship space excavation is deeper now, with solid shoring both vertically and horizontally.
Central Presbyterian > 1/21/2007: The concrete footers in the courtyard have now cured.
Central Presbyterian > 1/21/2007: The concrete footers in the courtyard have now cured.
Central Presbyterian > 1/21/2007: The concrete footers in the courtyard have now cured.
Central Presbyterian > 1/21/2007: A wider view of the courtyard.
Central Presbyterian > 1/21/2007: Courtyard - what?
Central Presbyterian > 1/29/2007: Working on relocating a storm drain line.
1/21/2007: The concrete footers in the courtyard have now cured.
 > 1/21/2007: The concrete footers in the courtyard have now cured.
1/21/2007: The concrete footers in the courtyard have now cured.
Camera: Canon (Canon Eos Digital Rebel Xt) |
More details: exif |
Original size: 2100px x 1400px |
Current: 400px x 267px |
Other sizes: Small • M • L • O • save photo |
filename: IMG_8522 |
Share photo: links, forums, blogs |
Gallery pages:  <<  <  3  4  5  6  7  8  >  >>
< 49 of 477 >

Comments

| hide gallery comments |

New comment: Requires approval

Comment on: | Rating: stars
Name:
Link:
To foil spammers, enter this code: copy this text in this box: Code unreadable?
Central Pres: photos | centralpc.org | visiting us | prints & stuff | privacy/photo policy | email webmaster
Powered by SmugMug | Login | Shopping Cart | Portions © 2008 SmugMug, Inc.
Show FeedsAvailable Feeds | What are feeds?
Gallery Photos:
Atom FeedAtom | RSS FeedRSS