SmugMug
Home  Login  Help  
 
 View Cart
Central Presbyterian  > Our place - buildings, construction, new plans > New Building - Construction
This Construction is all done! Dedication services were April 20th, 2008. We've been using the space ever since....
Gallery pages:  <<  <  48  49  50  51  52  53  >  
< 442 of 477 >
Central Presbyterian > 1/30/2008: flooring work
Central Presbyterian > 1/30/2008: column lighting
Central Presbyterian > 1/31/2008: carpet installation
Central Presbyterian > 1/30/2008: carpet installation
Central Presbyterian > 1/31/2008: carpet installation
Central Presbyterian > 1/30/2008: carpet installation
Central Presbyterian > 1/31/2008: carpet installation
Central Presbyterian > 2/6/2008: kitchen
Central Presbyterian > 2/6/2008: kitchen
1/30/2008: flooring work
 > 1/30/2008: flooring work
1/30/2008: flooring work
Camera: Olympus Imaging Corp. (E-500 ) |
More details: exif |
Original size: 1024px x 768px |
Current: 400px x 300px |
Other sizes: Small • M • L • O • save photo |
filename: 2008-01-30-002-tile-install |
Share photo: links, forums, blogs |
Gallery pages:  <<  <  48  49  50  51  52  53  >  
< 442 of 477 >

Comments

| hide gallery comments |

New comment: Requires approval

Name: Email: Link:
Connect  Connect with Facebook


Comment on: | Rating: stars
To foil spammers, enter this code: copy this text in this box: Code unreadable?

Add Comment Cancel

Central Pres: photos | centralpc.org | visiting us | prints & stuff | privacy/photo policy | email webmaster
Powered by SmugMug | Login | Shopping Cart | Help | Portions © 2010 SmugMug, Inc.
Show FeedsAvailable Feeds | What are feeds?
Gallery Photos:
Atom FeedAtom | RSS FeedRSS