This Construction is all done! Dedication services were April 20th, 2008. We've been using the space ever since....
1/12/2007: excavation is progressing, as does work on shoring up the sides of the hole. This workman is welding on horizontal beams that give extra strength to the shoring. On this side they could not drive the beams down the 20 ft they wanted, so they add brackets and welded connecting beams.
1/12/2007: excavation is progressing, as does work on shoring up the sides of the hole. This workman is welding on horizontal beams that give extra strength to the shoring. On this side they could not drive the beams down the 20 ft they wanted, so they add brackets and welded connecting beams.