Central Presbyterian  > Our place - buildings, construction, new plans > New Building - Construction
This Construction is all done! Dedication services were April 20th, 2008. We've been using the space ever since....
Gallery pages:  <  1  2  3  4  5  6  >  >>
< 38 of 477 >
Central Presbyterian > 1/12/2007: excavation is progressing, as does work on shoring up the sides of the hole.  This workman is welding on horizontal beams that give extra strength to the shoring.  On this side they could not drive the beams down the 20 ft they wanted, so they add brackets and welded connecting beams.
Central Presbyterian > 1/12/2007: excavation is progressing, as does work on shoring up the sides of the hole.  This workman is welding on horizontal beams that give extra strength to the shoring.  On this side they could not drive the beams down the 20 ft they wanted, so they add brackets and welded connecting beams.
Central Presbyterian > 1/12/2007: The preschool kids get to come watch for a while.
Central Presbyterian > 1/14/2007: a beautifully-dug out courtyard
Central Presbyterian > 1/14/2007: the other end of the courtyard excavation
Central Presbyterian > 1/14/2007: excavation and shoring continue for the new worship space.
Central Presbyterian > 1/14/2007: Here you can see where the south entrance has been partially cut off.  A new entrance will be built there later.
Central Presbyterian > 1/18/2007: the excavation for the worship space has gone deeper
Central Presbyterian > 1/16/2007: The courtyard excavation continues, with holes for concrete footers now being dug.
1/12/2007: excavation is progressing, as does work on shoring up the sides of the hole. This workman is welding on horizontal beams that give extra strength to the shoring. On this side they could not drive the beams down the 20 ft they wanted, so they add brackets and welded connecting beams.
 > 1/12/2007: excavation is progressing, as does work on shoring up the sides of the hole.  This workman is welding on horizontal beams that give extra strength to the shoring.  On this side they could not drive the beams down the 20 ft they wanted, so they add brackets and welded connecting beams.
1/12/2007: excavation is progressing, as does work on shoring up the sides of the hole. This workman is welding on horizontal beams that give extra strength to the shoring. On this side they could not drive the beams down the 20 ft they wanted, so they add brackets and welded connecting beams.
Camera: Canon (Canon Eos Digital Rebel Xt) |
More details: exif |
Original size: 1161px x 774px |
Current: 400px x 267px |
Other sizes: Small • M • L • O • save photo |
filename: IMG_8439-crop-close |
Share photo: links, forums, blogs |
Gallery pages:  <  1  2  3  4  5  6  >  >>
< 38 of 477 >

Comments

| hide gallery comments |

New comment: Requires approval

Name: Email: Link:
Connect  Connect with Facebook


Comment on: | Rating: stars
To foil spammers, enter this code: copy this text in this box: Code unreadable?

Add Comment Cancel

Central Pres: photos | centralpc.org | visiting us | prints & stuff | privacy/photo policy | email webmaster
Powered by SmugMug | Login | Shopping Cart | Help | Portions © 2010 SmugMug, Inc.
Show FeedsAvailable Feeds | What are feeds?
Gallery Photos:
Atom FeedAtom | RSS FeedRSS