SmugMug
Home  Login  Help  
 
 View Cart
Central Presbyterian  > Our place - buildings, construction, new plans > New Building - Construction
This Construction is all done! Dedication services were April 20th, 2008. We've been using the space ever since....
Gallery pages:  <<  <  48  49  50  51  52  53  >  
< 424 of 477 >
Central Presbyterian > 1/20/2008: back stage space to the side
Central Presbyterian > 1/20/2008: stage, the unfinished square is where one of the backlit projection screens will be installed.  speakers and lighting can be seen overhead.
Central Presbyterian > 1/20/2008: east side
Central Presbyterian > 1/20/2008: south side
Central Presbyterian > 1/20/2008:
Central Presbyterian > 1/20/2008: north wall
Central Presbyterian > 1/20/2008: overhead stage lighting
Central Presbyterian > 1/20/2008: sound booth and south-east entrance
Central Presbyterian > 1/20/2008: sound booth interior
1/20/2008: back stage space to the side
 > 1/20/2008: back stage space to the side
1/20/2008: back stage space to the side
Camera: Canon (Canon Eos Digital Rebel Xt) |
More details: exif |
Original size: 3456px x 2304px |
Current: 400px x 267px |
Other sizes: Small • M • L • O • save photo |
filename: IMG_4598-backstage-space |
Share photo: links, forums, blogs |
Gallery pages:  <<  <  48  49  50  51  52  53  >  
< 424 of 477 >

Comments

| hide gallery comments |

New comment: Requires approval

Name: Email: Link:
Connect  Connect with Facebook


Comment on: | Rating: stars
To foil spammers, enter this code: copy this text in this box: Code unreadable?

Add Comment Cancel

Central Pres: photos | centralpc.org | visiting us | prints & stuff | privacy/photo policy | email webmaster
Powered by SmugMug | Login | Shopping Cart | Help | Portions © 2010 SmugMug, Inc.
Show FeedsAvailable Feeds | What are feeds?
Gallery Photos:
Atom FeedAtom | RSS FeedRSS