This Construction is all done! Dedication services were April 20th, 2008. We've been using the space ever since....
1/4/2007: steel beams driven into the ground. These beams are driven in around the where the hole will be dug to shore up the sides, preventing them from collapsing. At this point they've been driven in and cut off.
1/4/2007: steel beams driven into the ground. These beams are driven in around the where the hole will be dug to shore up the sides, preventing them from collapsing. At this point they've been driven in and cut off.
Camera: Canon (Canon Eos Digital Rebel Xt) |
Original size: 2223px x 2689px |
Current: 248px x 300px |
filename: IMG_8341 |